MAXTOP
INTERNATIONAL
Apparel Buying House Production
Full-Service Apparel Buying House

How We Power Your Apparel Brand In Bangladesh

A transparent, reliable buying and sourcing partner. From fabric milling and rapid proto sampling to bulk manufacturing and port clearance.

WHAT WE PROVIDE

End-To-End Sourcing & Manufacturing Services

Managing your entire supply chain with transparent costing, audited compliance, and strict AQL quality standards.

Yarn, Fabric & Trims Sourcing
RAW MATERIAL PROCUREMENT

Yarn, Fabric & Trims Sourcing

Direct mill linkage across Bangladesh & South Asia. Sourcing combed cotton, BCI organic yarn, CVC, linen, and specialized synthetic blends with zero broker overhead.

Mill-direct rates with strict yarn quality audit
Custom pantone lab dips (3-5 days turnaround)
High-grade trims, YKK zippers & custom metal hardware
CAD Pattern & Sample Prototyping
DESIGN & RAPID SAMPLING

CAD Pattern & Sample Prototyping

Transforming buyer tech-packs and moodboards into production-grade patterns. Utilizing 2D/3D CAD to verify drape, tension, and fit before cutting bulk fabric.

Physical counter & fit samples in 5-7 days
CLO 3D virtual fittings for rapid buyer sign-off
Precision grading for US, EU & Asian size specs
Factory Allocation & Merchandising
VETTED VENDOR SELECTION

Factory Allocation & Merchandising

Allocating your orders to the most suitable audited manufacturing lines based on machine capability, gauge, washing specialty, and target lead-time.

Dedicated merchandiser managing daily T&A calendar
Accord / RSC, BSCI, SEDEX vetted partner factories
High capacity for Knitwear, Wovens, Denim & Outerwear
Multi-Stage Quality Control (AQL 1.5)
STATIONED IN-LINE AUDITS

Multi-Stage Quality Control (AQL 1.5)

Our on-site QA officers monitor every manufacturing stage from cut-to-pack, enforcing zero tolerance for measurement tolerances or sewing defects.

Strict ISO 2859-1 (AQL 1.5 / 2.5) inspection standards
4-point fabric inspection & in-line roving checks
100% metal detector scan prior to carton sealing
In-House Lab Testing & Compliance
SAFETY & CHEMICAL STANDARDS

In-House Lab Testing & Compliance

Comprehensive physical and chemical laboratory testing ensuring every batch complies with international consumer safety and eco-regulations.

Wash fastness, rub fastness, pilling & shrinkage tests
OEKO-TEX Standard 100, REACH & GOTS verification
Detailed laboratory test reports issued before dispatch
Chittagong Port Logistics & Export
FOB CTG & CIF SHIPPING

Chittagong Port Logistics & Export

From factory warehouse loading to container gate-in at Chittagong Port (CTG), our logistics department manages all customs clearing and export manifests.

Export documentation (BL, GSP Form A, Packing List, CO)
Vessel space booking during peak shipping seasons
Flexible Incoterms: FOB Chittagong, CIF, CFR & Air Express
HOW WE DELIVER

The 5-Step Order Execution Journey

From your initial tech-pack submission to final container dispatch at Chittagong Port.

0124 - 48 Hours

Tech-Pack & Costing

You send your garment sketch or specs. We calculate fabric yield and provide a transparent, open-book quote.

SOP Compliant
025 - 7 Days

Sampling & Fit Approval

We develop physical counter-samples and color lab dips. You review fit, fabric weight, and hand-feel for approval.

SOP Compliant
0315 - 20 Days

Milling & Trims Booking

Mill yarn spinning, fabric knitting/weaving, dyeing, and custom trims development (custom buttons, YKK zips, labels).

SOP Compliant
0430 - 45 Days

Bulk Production & In-Line QC

Cutting, sewing, and washing lines operate with our resident QC inspectors checking every seam, stitch, and measurement.

SOP Compliant
05On Schedule

Final Audit & Port Dispatch

Final AQL 1.5 audit, export carton packing, customs clearance, and container handover at Chittagong Port for vessel departure.

SOP Compliant
Garments Showroom
Start Your Production With Us

Have a Tech-Pack or Looking for a Reliable Sourcing Partner?

Send us your garment specs or sketches. We will revert with a detailed open-costing proposal within 24โ€“48 hours.